We provided system models and studies for the 110MW solar project located in Maine connected to a 115-kV substation. System models were developed in PSCAD and PSSE compliant with ISO-NE. Studies include the power factor study compliant with ISO-NE, the transient overvoltages (TOV) study, the harmonic analysis, and the NERC PRC 024 study.
August 8, 2023
admin