This project is located in ISO-NE territory. The 110MW project contains 40 solar inverters connected to a 115kV line. INS developed a PSCAD power system model and conducted the power factor study, harmonic study, transient overvoltages study, and NERC PRC-024 study.
July 3, 2020
admin